| Project | Dairy farm, 5,000 cows |
|---|---|
| Construction area | 45,000+ m² |
| Main structure | Galvanized welded H beams, round pipes |
| Welding | Automatic submerged-arc welding |
| Connection | Bolted |
| Roof | 0.5 mm U840 color steel sheet + daylighting panels |
| Wall | 0.5 mm U840 color steel sheet + insulation |
| Lead time | About 55 days |