STEEL STRUCTURE NURSING HOME WITH OPEN FLOOR PLANS
This three-storey retirement home uses a steel frame as its main structure. High-strength steel allowed a large-bay layout, so the floors can be partitioned freely into rooms, corridors and shared spaces. A brick-and-concrete building would have limited the layout and added weight and cost. The frame was fabricated with automatic submerged-arc welding and bolted together on site.
Key advantages
Open, adaptable layouts for care facilities
Lighter than brick-concrete, lower foundation cost
Recyclable, energy-efficient envelope options
Short on-site construction time
Specifications
Project
Three-storey nursing home
Main structure
Q235 steel beams and columns
Welding
Automatic submerged-arc welding
Connection
Bolted
Layout
Large bays, flexible partitions
Packing
Bundled members
Lead time
About 45 days
RELATED PRODUCTS
More from Commercial & Civil Buildings.
Prefabricated Civil Steel Building
Q345 H-section frame for offices, apartments and public buildings. Cladding from ALC panels to glass curtain wall.
High-Rise Steel Frame Residential Building
Multi-storey apartment frame with H or box columns and steel floor decks installed floor by floor.
Steel Structure School & Kindergarten
Light, high-tensile steel frame for classrooms, kindergartens and sports halls. Clear spans up to 50 m.
Gas Station Steel Canopy
Steel truss canopy for fuel stations and carports. Hot-dip galvanized or painted for corrosion resistance.
Yes. Steel frames are widely used for multi-storey and high-rise residential buildings. The frame is lighter than concrete, goes up faster and leaves fewer interior columns, so layouts are more flexible.
Steel is ductile and bends rather than cracks, which makes steel frames a common choice in seismic zones. We design to the seismic intensity of your site.
Dimensions (length, width, height or number of floors), the site location for wind, snow and seismic loads, the intended use, and your preferred roof and wall materials. A sketch or a photo of a similar building is enough to start.
Members are numbered, bundled and loaded in 40 ft containers or on flat racks with a packing list and erection drawings. We ship FOB Ningbo or Shanghai, or CIF to your port.