| Project | Steel warehouse frame |
|---|---|
| Floor area | 3,040 m² |
| Main structure | Welded or hot-rolled H-section |
| Secondary | C and U section steel |
| Welding | Automatic submerged-arc welding |
| Connection | Bolted |
| Roof & wall | Sandwich panel or steel sheet |
| Surface | Hot-dip galvanized |
| Lead time | About 45 days |