Industrial Solar Mounting Structure

PV mounting for factory roofs and plants: SUS 304 / aluminum 6005-T5, 60 m/s wind, 25-year life.

PRODUCTS



FREE LAYOUT DESIGN


Send your building size and location. We reply with a layout drawing and a priced material list, usually within 48 hours.

INDUSTRIAL SOLAR PANEL MOUNTING STEEL STRUCTURE

Heavy-duty PV mounting for factory roofs, logistics parks and ground-mounted industrial plants. We combine H-section steel, which offers high bending and torsion resistance, with stainless steel and aluminum rails. Structures are designed for wind speeds up to 60 m/s and snow loads of 1.4 kN/m², for buildings up to 22 m tall (higher on request).

Key advantages
  • H-section steel for strong bending resistance
  • Recyclable materials, no construction waste
  • Easy maintenance
  • Engineered for typhoon-level wind

Specifications

MaterialSUS 304, aluminum 6005-T5 / 6063-T6, H-section steel
Wind speed60 m/s
Snow load1.4 kN/m²
Building heightUp to 22 m, customized
Warranty10 years
Service life25 years
StandardISO 9001
PackingPallets or cartons




RELATED PRODUCTS

More from Solar Steel Structures.



FREQUENTLY ASKED QUESTIONS


WHICH PANELS DO YOUR STRUCTURES FIT?
Our rails and clamps fit most standard framed PV modules. Tell us the module size and quantity and we will size the structure.
WHAT DO YOU NEED FOR A QUOTE?
Dimensions (length, width, height or number of floors), the site location for wind, snow and seismic loads, the intended use, and your preferred roof and wall materials. A sketch or a photo of a similar building is enough to start.
HOW IS IT PACKED AND SHIPPED?
Members are numbered, bundled and loaded in 40 ft containers or on flat racks with a packing list and erection drawings. We ship FOB Ningbo or Shanghai, or CIF to your port.
CAN AN EXISTING ROOF CARRY SOLAR PANELS?
Often yes, but it must be checked. Send us the roof drawings or photos and we will check the extra load and recommend reinforcement if needed.
STEEL OR ALUMINUM MOUNTING?
Galvanized or ZAM steel is stronger and more economical for carports and large spans; aluminum is lighter for rooftops. We supply both and often combine them.
WHAT IS THE LEAD TIME?
Most orders ship 35–55 days after drawing approval, depending on tonnage and coating. Urgent projects can be split into phased shipments.


PHOTOS